Completed projects - Electrical part and automation
Home >> Completed projects >> Electrical part and automation
Kardzhali dam region - Reconstruction of electrical panels and power cables in the intake tower – engineering
The project includes design, supply, installation and commissioning of following equipment:
- Asynchronous motors with built 4x45kW electromagnetic brakes;
- Frequency inverters for speed control of the board shutter;
- Freight resistors;
- Switchboards for supply and control of the facilities in the intake tower;
- Microprocessor based control system and operator panels;
- Position switches and sensors fortable gates position monitoring;
- Construction of cable traces and cabling.