Completed projects - Electrical part and automation
Home >> Completed projects >> Electrical part and automation
PSHPP “Beglika” – complete rehabilitation
The project includes design, supply, installation and commissioning of following equipment:
- Water pump – 2 x 450kW, 6kV;
- Switchgear 20kV and 6kV;
- Power transformer and transformer own needs;
- Charger and accumulator battery;
- Reinforced concrete foundations;
- Strengthening of reinforced concrete slab and columns with carbon fiber;
- Pipe arrangement;
- Input and output shutters - throttle valves with electrical power;
- Switchboards for control of pump stations;
- Control system based on microprocessor control panel and operator;
- Damlevel measuring system;
- Construction of cable traces and cabling.