Research, design and maintenance of Canal “Srebarna - Ginski” from Petrohan Cascade
- Building of operating and approach roads for the channel trace;
- Digging and removal of existing concrete pipes with diameters from Ø300 up to Ø1210;
- 52 pieces of pipe culverts were built along the whole trace;
- Implemented a supply and installation of new fiberglass pipes with diameters from Ø250 up to Ø1100 and total length of over 21,100 meters;
- Building of 196 pieces of manholes;
- A complete repair of the 23 intakes;
- Restore of rebate equipment of 3 tunnel sections;
- Construction of mud box with size 30.0 / 3.0 / 2.2 m.