Home >> Completed projects >> Hydraulic engineering construction
Overhaul of daily reservoir “Vidima” – engineering
The project includes design, supply and installation of waterproof system, based on geosynthetic membrane.
- Cleaning the reservoir from sediments bigger than 400 m3;
- Restoration of the compromised sections of the slopes and bottom of the reservoir;
- Laying protective PVC waterproof membrane inside of the reservoir with total area of 7000 m2;
- Rehabilitation of the gates and construction of level-measuring system;
- Rehabilitation of water-tightness of the dilatation joints for outside;
- Building of protection construction against falling of foliage, branches and stones in the reservoir;
- Restoration of the operating road within the reservoir area.