Cherepish HPP – Delivery, mounting and commissioning of electrical equipment and apparatus
- Delivery of electrical equipment – cables and cable routes, power dry transformer, HV power switchboards, telemetric and communication system;
- Delivery and installation of Diesel generator set in metal container 100 kVA, 0.4 kV, compete with ABP panel on ready foundation.
- Installation of cable routes – cable trays, cable frames, PVC conduits, steel and PVC pipes;
- Installation of 6 kV, 0.4 kV power cables and control cables on prepared cable routes, including connections;
- Installation of 20 kV concrete complete transformer station consisting of 5 switchgears and control gears and 3 power transformers on prepared foundation.
- Installation of 15 x 0.4 kV power boards – self-supporting for wall installation;
- Delivery and installation of hydraulic equipment driving the overflow and gate controls;
- Delivery and installation of control and alarm system on side panel gates;
- Delivery and installation of drain shaft level gauge equipment – conductivity probes, sensors, process indicators, level controllers;
- Firefighting equipment and facilities, personal protection equipment;
- Commissioning.