Research, design and maintenance of Canel “Iskretski” from Petrohan Cascade
- Building of operating and approach roads for the channel trace, including the adjacent equipment – length 24 km;
- Digging and removal of existing concrete pipes with diameters from Ø400 up to Ø800;
- Supply and installation of new fiberglass pipes with diameters from Ø400 up to Ø800 and total length of over 18 km;
- Building of 168 pieces of manholes;
- A complete repair of 10 intakes;