Home >> Completed projects >> Hydraulic engineering construction
HPP MEZDRA
The works includes incorporates the installation of a synthetic geomembrane facing in the trapezoidal section of the canal, over a length of 1590m. The installation include placement of 35 479m2 ot the waterproofing system and installation of of 1590 watertight penetrations in the bottom ot the canal. Installation of 100m watertight perimeter seal at the upstream and downstream end of the new synthetic liner with 60x6mm stainless steel battens trips.The flow of the canal is 45m3/sec.